Pilot planning / Field guide
Your AI Pilot Needs a Scorecard, Not a Victory Lap.
A promising first run is not the finish line. Count the review, the rework and what the team should do next.
- 01Baseline
Measure the current completed job.
- 02Run
Use comparable cases and scope.
- 03Review
Count corrections and human effort.
- 04Decide
Expand, revise, observe longer or stop.
The pilot produces its first result. The screen looks good. Everyone is pleased. Someone starts drafting a slide about transformation.
There is just one small question left: did the work actually improve?
A short finance automation pilot can answer a useful, bounded question. It can show whether a particular workflow completes comparable work with less effort, acceptable quality and intact controls.
It cannot establish every future benefit in thirty days. Nor should it have to. The point is to create enough evidence for the next decision, not to give the first successful run a confetti budget.
Start with a job, not a promise
Define the workflow in terms the team can recognize. For example: prepare a particular class of supplier-invoice exceptions for review, or assemble one recurring reporting package from agreed inputs.
State where the job begins and what counts as finished. An extracted document is not a resolved invoice. A generated report is not necessarily a reviewed report.
Agree on the case types in scope, the systems involved, required approvals and a human owner. Record which cases remain outside the pilot so that the denominator does not quietly shrink to the easy ones.
Then choose the decision the pilot will support. Are you testing whether to expand the volume, add another entity, revise the design or stop? A scorecard is easier to write when it has an actual decision to serve.
Give the old process a fair hearing
Measure the current workflow before comparing it with the new one. Include preparation, evidence gathering, review, corrections and recurring administration.
Use comparable cases and a consistent definition of completion. A clean invoice and a disputed one are not interchangeable units of work.
Separate active handling time from elapsed cycle time. A task may take ten minutes of effort but wait two days for an approval. Improving one does not automatically improve the other.
Keep the baseline honest even when it makes the opportunity look smaller. If the existing ERP already handles a step well, count that capability rather than assigning the automation credit for work nobody was doing manually.
The pilot should beat the real process, not an especially inconvenient fictional version of it.
Count the work that came back
- Baseline effort400 cases at 12 minutes each
- 80 hours
- Pilot handling and review400 cases at 4 minutes each
- 26.7 hours
- Recurring administration
- 6 hours
Illustrative workload. Setup effort and tool costs are assessed separately.
Consider an illustrative workload of 400 cases. At 12 minutes per case, the baseline requires 80 hours.
Suppose the pilot reduces handling, review and correction effort to four minutes per case. That is about 26.7 hours. Add six hours of recurring administration, and the net capacity released is about 47.3 hours.
The calculation is 80 minus 26.7 minus six, using unrounded values before presenting the result.
Those hours are not automatically cash savings or a headcount reduction. They describe capacity the team could use differently. Whether that becomes lower cost depends on staffing, workload and actual spending decisions.
Also assess setup effort, training, tool costs and any additional operating requirements separately. Do not hide them inside an attractive monthly number or forget them because they happened before the measurement window.
Five measures, one decision
A useful scorecard combines five views of the completed workflow:
- Net effort: the human time remaining after preparation, review, corrections and recurring administration.
- Quality: whether outputs are correct, supported by evidence and usable for the intended decision.
- Cycle time: elapsed time to a confirmed result, including waiting and the slower cases.
- Coverage: which eligible cases completed successfully, which needed intervention and which were excluded.
- Reliability: failures, recoveries and the team's ability to establish the final system state.
Keep the underlying cases available for review. A headline average can hide a cluster of difficult cases or a small number of serious errors.
Test failure paths, not just successful runs. What happens when a source changes, access is denied or a write times out? The ERP integration checklist provides concrete acceptance-test prompts.
Agree on acceptance criteria before inspecting the final results. Otherwise, it is surprisingly easy to discover that the metric you intended to improve was whichever one happened to improve.
Thirty days is a window, not a crystal ball
A daily workflow may produce many observations in thirty days. A monthly close may produce one live cycle. Those are different amounts of evidence.
Historical replays can test known cases and boundary conditions, but they do not prove that live coordination, access and recovery will behave identically. Report replay results separately from live results.
Be explicit about the limitations: sample size, case mix, seasonality and any manual support provided during the trial.
If the evidence is promising but incomplete, define what additional observation is needed and when the team will decide. Extending a pilot without a new question is just moving the finish line into another calendar month.
End with a decision, not a victory lap
Conclude with one of four actions: expand, revise, extend observation for a stated reason, or stop. Name the owner, next step and evidence behind the decision.
Stopping a poor fit is a valid result. Revising a specific handoff can be a better outcome than expanding a workflow that merely looked impressive on its first run.
Book a Call to scope a pilot around one completed finance job and a scorecard the team can defend.
The best pilot does not end with "look what AI did." It ends with "here is what we should do next."